CONTACT US [email protected] - Fri 7am - 4pm PST 10am - 7pm ESTFor help with assemblyIf you have received a d
Page 10 of 20Accrocher une seule armoire 36 po.Hanging a Single 36” CabinetSi vous installez un seul cabinet uniquement, assurez-vous que le rail méta
Page 11 of 20Hanging Multiple CabinetsWe will illustrate how hang multiple cabinets using the sample configuration below. 1. On your wall, mark where
Page 12 of 20The illustration below shows where the Metal Rails & Connecting Braces should be attached to the wood studs for this configurationNOT
Page 13 of 20Installing Hang Ups Garage CabinetsInstallation “Hang Ups” Garage armoires 1279½”Measure 79½ inches from the floor and make multiple mar
Page 14 of 20Find the center of the wall studs and mark the location of each stud along the line. Studs are typically 16 inches apart center to cente
Page 15 of 20Hang the First RailAccrocher la première position de RailPosition the Metal Rail over the pre-drilled holes and insert wood screws into t
Page 16 of 20Hanging the Second RailSlide the second Metal Rail BEHIND the Connecting Brace Secure the Connecting Brace to the Second Rail6Accrocher l
Page 17 of 207TRWallMurWallMurCarefully hang the cabinet onto the Metal Rail until it locks into place. Laisser pendre soigneusement le cabinet sur la
Page 18 of 208 9Attach doors Fixez les portesInsert metal dowel pins and add adjustable shelves Insérer les Goujons de métal et ajouter étagères aju
Page 19 of 20Vertical Door Alignment:Loosen the top & bottom Hinge Plate Screws (on both hinge sets) and move the door up or down.Alignement de la
Page 2 of 20Top (1)DessusTP-10049-G gray / gris Gable (1)PignonGA-10053-G gray / gris Left Side (1)Côté gaucheSL-10052-G gray / gris Right Side (1) C
Page 20 of 20CALL US 1-877-PREPAC1 (1-877-773-7221)Mon - Fri 7am - 4pm PST10am - 7pm EST Email Us: [email protected] Us Your FeedbackFaites-
Page 3 of 203’’ Wood Screw (3)Vis à bois 3 poucesRM-0835Allen Key (1)Clef “Allen” RM-0313Allen Key Bit (1) Clef“Allen” mècheRM-0923Euro Hinge (6)Euro
Page 4 of 201a1bC2C2C5Rail HookCrochet de suspension BoltBoulonNylon Lock NutÉcrous de blocage en nylon Confirmat ScrewVis ConfirmatAttach Rail Hooks
Page 5 of 202a2b2cGreen Twister Dowel Goujons verts à visserC3C42a2b2cAttach Rail Hooks to the Left (C3) & Right (C4) Sides as you did in Step 1.
Page 6 of 203Tightening Cams Pour serrer les camesUnlocked LockedTurn 210°Déverrouillées Verrouiller en tournant 210 degrés vers la droiteInsert cams
Page 7 of 20STEP 3 Estimated Time: 10 minutes4a4bAttach Bottom Stabilizer (C7) to Left (C3) and Right (C4) Sides with Confirmat Screws Fixez le r
Page 8 of 205a5bAttach Bottom Shelf (C8) to Left (C3) and Right (C4) Sides with Confirmat Screws Fixez l’étagère inférieure (C8) vers la gauche (C3)
Page 9 of 20Before you begin: Make sure you have the following tools and hardware:• stud finder• power screwdriver or drill • 3/16th inch drill bit
Kommentare zu diesen Handbüchern